huilai logo
HUILAI SCAFFOLDING

China Scaffold Manufacturer

首页 » Scaffolding Products » formwork systems » Formwork Accessories » Water Stop Tie Rod Connector for Concrete Walls

Water Stop Tie Rod Connector for Concrete Walls

The water stop tie rod connector is an embedded formwork accessory for concrete walls that require a water-stopping detail at the tie point. A 0.48 kg configuration is available. Confirm the tie rod thread, wall thickness, component geometry, surface finish, quantity, and matching hardware before production.

Water Stop Tie Rod Connector for Water-Retaining Walls

A water stop tie rod connector forms part of the tie arrangement used in cast-in-place concrete walls. It connects compatible tie rod sections from both form faces and places a water-stopping barrier at the tie point. Here, water stop tie rod refers to the compact embedded connector, not a complete welded-plate rod or three-stage tie assembly. Confirm the thread geometry, rod diameter, wall thickness, finish, and remaining hardware before production. This distinction matters when matching existing formwork systems, because similar outside shapes do not guarantee the same internal thread or installation method.

How the Tie Rod Water Stopper Works

In a common assembly, installers screw one compatible tie rod into each side of the stopper. External tie hardware then transfers the clamping force that keeps the two form faces in position during the concrete pour. The stopper sits within the wall section, and its central barrier interrupts the direct path along the tie point. The project detail must still define the required sealing treatment around the complete tie location. The tie rod water stopper is only one of the formwork accessories needed for the connection. Depending on the selected system, the full set may also use outer nuts, plates, cones, sleeves, or removable rod sections. When the assembly uses removable outer rods, workers can take them out after stripping while the embedded component remains in the concrete. Confirm that removal sequence before approving the component list.

Formwork Water Stop Applications

A formwork water stop commonly appears in cast-in-place walls where the project requires additional control at form-tie penetrations. Typical contexts include basement walls, water tanks, retaining walls, lift pits, and other below-grade or water-retaining concrete structures. The project engineer should define the water-control detail, embedment position, tie spacing, concrete cover, and any treatment needed after formwork removal. The component controls one tie location; it does not replace joint waterbars, concrete mix design, crack control, or the wider waterproofing specification. When a project uses several wall configurations, review the tie layout together with the selected formwork solutions. Different wall thicknesses may require different rod lengths even when the embedded stopper remains unchanged.

GI Finish and Product Identification

“GI water stopper for tie rod” indicates a galvanized finish in market terminology, but it does not state the coating method or required coating level. Specify whether the order needs electro-galvanizing, hot-dip galvanizing, or another confirmed finish. Do not identify the coating from a yellow, silver, or black appearance alone.

Thread and Tie Rod Compatibility

Compatibility depends on the internal thread rather than product weight or surface color. Water stoppers with similar outside shapes may use different rod diameters, pitches, or thread profiles. The correct unit should screw onto the tie rod smoothly and provide enough thread engagement. A rod that turns only a few times does not prove that the connection matches.

What to Confirm Before Ordering

For a replacement water stop tie rod, send a dimensioned drawing or an undamaged sample. Close-up photos of both thread openings, the side profile, and the center barrier can help prevent a mismatch. Include the quantity, finish, and packing method when you request a formwork quotation. Then check whether the connector shape and tie length suit the wall thickness. If the original thread details are unavailable, include a sample or clearly dimensioned drawing with the RFQ. For a larger formwork supply order, list the embedded stopper, outer tie rods, nuts, and other reusable hardware separately. Give each item its own quantity and specification, and state any finish or packing requirements for the order. After you fix the stopper interface, review related matching components through the HUILAI product range.

Formwork Water Stop Technical Specifications

Parameter Specification
Product Type Formwork Water Stop / Water Stopper
Unit Weight 0.48 kg
Reference Tie Rod Size D15/17 mm
Reference Length 110–113 mm
Reference Water Stop Plate Diameter Ø60–65 mm
Reference Spigot Diameter Ø26 mm
Reference Material Ductile Cast Iron / Steel
Surface Treatment Galvanized / Zinc Plated
Reference Tensile / Breaking Capacity Approx. 180 kN
Application Formwork Tie Rod System for Water-Retaining Concrete Structures
Function Prevents water penetration along the tie-rod path after concreting
PACKING & SHIPPING

Packaging and Shipping for Export Orders

For export scaffold orders, packing is arranged according to product type, quantity, surface finish, loading method, and buyer requirements.

Huilai Scaffolding can support bulk packing, pallet packing, shipping marks, and order checks before loading.

Formwork water stop bulk bags on pallets inside a shipping container
01

Bulk Export Packing

Packing can be arranged by bundle, pallet, carton, or carton with pallet according to product size, quantity, and container loading plan.

02

Packing Mark Support

Labels, item marks, and shipping marks can be arranged according to buyer reference, product type, quantity, and warehouse needs.

03

Order Check Before Shipment

Product name, quantity, surface finish, packing method, marks, and buyer reference can be checked against the order details before shipment.

04

Container Loading Plan

Packing and loading can be arranged according to product size, order quantity, weight, and available container space.

Need a Custom Solution?

Send your product name, drawing or sample photo, required quantity, surface finish, and destination country.

Huilai Scaffolding will check the details and reply with a project-based quotation.

PRODUCT RANGE

Explore More Scaffolding Products from Huilai

Browse Huilai scaffolding systems, scaffold parts, safety access components, formwork accessories, and shoring products

for contractors, rental companies, distributors, and infrastructure projects worldwide.

MORE APPLICATIONS

Find Scaffolding Solutions by Application

Different jobsites may need different scaffold systems, access methods, platform layouts, and component lists. Use these application pages to compare how Huilai scaffolding products are used in construction, facade access, industrial maintenance, oil and gas, power plant, bridge, and infrastructure projects.

Facade Scaffolding

For exterior walls, cladding, painting, and curtain wall work.

Industrial Scaffolding

For plants, tanks, pipes, equipment areas, and andmaintenance work.

Bridge & Infrastructure Scaffolding

For bridges, viaducts, tunnels, public works, and civil projects.

Power Plant Scaffolding

For boilers, turbines, cooling towers, and outage maintenance.

Oil & Gas Scaffolding

For refineries, pipe racks. tanks, and shutdown work.

Construction Scaffolding

For building work, masonry, concrete access, and general platforms.

From Components to Systems

Integrated Production for the Entire Scaffolding Range

From precision-engineered components to integrated systems, our state-of-the-art production lines deliver

the full spectrum of scaffolding solutions with uncompromised industrial standards.

PRODUCT FAQ

FAQ for Scaffold Product Buyers

These answers are based on the product details, common RFQ questions, and export order requirements.

Final dimensions, finish, packing, and delivery terms should be confirmed before quotation.

On this page, a water stop tie rod means a tie arrangement that uses a compact embedded water stopper between compatible rod sections. The available water stop component weighs 0.48 kg. It is not the same as a complete rod with a welded water-stop plate or a three-stage water-stop screw, so state the required assembly clearly in the RFQ.

The 0.48 kg weight and outside shape alone cannot confirm the correct size. Check the rod diameter, thread profile, pitch, internal thread size, and required engagement length. For replacement orders, provide a drawing or sample instead of assuming that every 12 mm or 17 mm tie rod uses the same thread.

Projects commonly specify it at form-tie locations in basement walls, retaining walls, water tanks, lift pits, and other water-retaining or below-grade concrete walls. The project engineer should confirm whether this type of embedded metal component suits the wall design and what additional sealing treatment the tie point requires.

The stopper connects compatible tie rod sections and places a central barrier within the concrete wall. The external hardware holds the form faces during the pour. In assemblies with removable outer rods, the embedded stopper remains after stripping. The project design must still define the full sealing and tie-hole treatment.

You may request a galvanized finish, but confirm the exact finish before production. “GI” alone does not distinguish electro-galvanizing from hot-dip galvanizing or define a coating requirement. State the coating method in the RFQ and do not rely on product color as proof of the finish.

Send the quantity, tie rod diameter, thread details, wall thickness, rod arrangement, surface finish, unit-weight reference, and packing requirement. Include a dimensioned drawing for a new assembly. For replacement stock, add clear photos or an existing sample so the production team can check the internal thread and central geometry.

REQUEST A QUOTATION

Send Your Scaffold Product Requirements

Send your product name, drawings, quantity, surface finish, destination port, and packing requirements. Huilai Scaffolding will check the details and prepare a practical export quotation for your project or bulk order.

We’ll respond within 24 hours with detailed pricing and delivery information.

Scroll to Top